An Airtable subcontractor deliverables portal can show which project handoff items are still missing, which files have arrived and which items need revision. Use miniExtensions for the external submission experience while project staff retains responsibility for acceptance.
Consider a fictional exhibition producer coordinating a signage subcontractor. Before installation, the producer needs a print-ready artwork package, a mounting plan and a location schedule. Receiving one ZIP file is not enough to know whether all three requirements have been met. The useful unit of work is the required handoff item, not the supplier’s general profile.
Give every required handoff item its own record
Create Projects with project name, coordinator, target handoff date and internal context. Subcontractor Contacts contains individual portal users and their organization. Assignments connects a subcontractor’s scoped package of work to the project, with the responsible coordinator and agreed deliverable list.
Add Required Items with Assignment, Item Name, Due Date, Expected Format (text), Acceptance Criteria (long text), Current Review State (single select) and a direct linked Subcontractor Contact. For the exhibition, create separate records for Artwork Package, Mounting Plan and Location Schedule.
Use Submissions for each dated delivery: Required Item, Submission Version, Files or File URL, Contributor Note and direct Subcontractor Contact. A Review Log records the submission reviewed, reviewer, decision, review date and revision request. Staff should control decisions and the current accepted-version reference.
This is a proposed schema rather than a bundled miniExtensions template. It deliberately separates the thing required from each attempt to supply it. That separation prevents a revised upload from erasing the context of an earlier rejection.
Write criteria that support a clear review
Replace vague requirements such as “send final files” with observable checks. The Artwork Package might require the named file formats and a sheet identifying the intended sign locations. The Mounting Plan might need a reference to the approved layout.
State who reviews each item and what happens if it is incomplete. A subcontractor should be able to read “include the missing entrance sign” rather than guess why a broad Project Status still says Waiting. Keep each revision request tied to the affected item.
Set a requested response date for revisions separately from the original due date. This makes it possible to see that an item was delivered late without rewriting the schedule every time a reviewer requests a correction.
Provide a focused subcontractor experience
For authentication, configure email verification under Users & Login, Login Fields. Use one valid email address per contact record. Personal-record filtering determines record scope; it is not the login method.
Each data table presented in the portal needs its own direct link to the user table, as described in the users-table documentation. Do not assume that linking a submission to an assignment establishes the user relationship automatically. Use individual contacts rather than one credential shared across an entire supplier organization.
For external views, use the personal-record display option and review all reachable tables. Staff should assign the relevant contact to each required item and submission. If multiple people need access, define that deliberately and verify the resulting scope rather than exposing all project records.
Show the requirement, due date, contributor submission fields and a reviewer message intended for the subcontractor. Keep internal evaluations and decisions separate. Review record creation and update controls for both the portal table and its child forms. Contributors should not be able to move a submission to another subcontractor’s assignment through an unrestricted selector.
Move from receipt to review to acceptance
Use item states such as Awaiting Submission, Received, Under Review, Revision Needed and Accepted. Receipt means material has arrived. Acceptance means the responsible staff member has reviewed a particular version against the stated criteria.
In the example, the coordinator receives Artwork Package version one and finds the entrance sign missing. The reviewer logs Revision Needed with the missing item and a response date. The subcontractor adds version two as a new submission. The reviewer then records acceptance against version two and updates the item’s accepted-version reference.
Do not remove version one simply because it is no longer current. Retain it according to your organization’s records policy, with a clear label so the installation team does not mistake it for the approved package. If files are stored at external URLs, review who can open them and whether the linked content can change after review.
Status transitions and accepted-version selection are manual staff actions in this baseline workflow. Uploading a file does not automatically validate its contents or approve a milestone.
Keep the project handoff separate from supplier administration
Treat the package as a dependency check, not an average completion percentage. The artwork may be accepted while the mounting plan still blocks installation preparation. Add a staff-maintained Blocks Next Step field to required items and record the specific blocked activity. The coordinator checks every blocking item before handing the package to the installation team. A changed site layout may reopen the mounting-plan requirement even if the artwork remains accepted; preserve that distinction rather than requesting every file again.
A project coordinator’s daily queue should surface overdue required items and received submissions awaiting review. Filter by project or coordinator to find the next decision, not merely the largest collection of attachments.
The final handoff packet identifies each required item, its accepted submission, reviewer and remaining caveats. If one optional item is waived, record who made that decision and why instead of marking it Accepted without a file. If the scope changes, add or retire the requirement explicitly.
This process differs from the supplier document renewal queue. It tracks whether the specific deliverables for one project have been reviewed. It does not establish insurance validity, regulatory compliance, payment entitlement or contractual acceptance unless your separately governed process expressly does so.
Check revisions and access before rollout
Rehearse with two fictional subcontractors assigned different items. Inspect lists, searches, expanded records, upload forms and linked-record choices as each user. Confirm that a reviewer can request a revision without exposing internal notes and that the subcontractor cannot change the review decision.
Then submit two versions for one item and confirm the staff can identify which version was reviewed and which is accepted. Inspect the completed-items view and every alternate editing route. The portal view controls can disable expansion and editing through a view, but creation, unlinking and other views need separate review.
These are recommended checks, not reported test results. The design suits projects with several required external handoff items and an available reviewer. For a one-off file request, use a simpler form.